Promote a project (promote to MAIN)
Project-level SAC are presented in the Project View as two lists within the Acceptance Criteria accordion-style expandable/collapsible content section, located below the Project Details and above the Classification Results section.
Automated Project-level SAC are listed to the left, with Manual Project-level SAC to the right.
Automated SAC have a yellow warning triangle icon if not yet met, and a green tick if their automated system checks confirm they are satisfied.
Manual SAC are presented initially as open checkboxes, each of which can be interactively signed-off (green-ticked) when the user's role-based access permissions match those configured for that SAC control.
For many projects it may be appropriate to only enable Manual SAC. In this case the Automated Criteria heading is still present, but that list is empty, and the project may then be promoted when all Manual SAC are signed-off.
Particular manual SAC require a specific role to be able to sign-off, such as PROJECT_LEAD, so more than one person may be needed to get all SAC satisfied, and those without a required role will see the current status of those SAC, but will not be able to change it.

When all mandatory project-level SAC are satisfied, the project is not diverged, and the project configuration enables promotion, the Promote button will be active for those with the PROJECT_LEAD role.

Press Promote to promote the project contents to the mainline branch.
A "Preparing for project promotion..." notification is presented in the page header.

On completion of the promotion process, a "Project successfully promoted for " notification is presented in the page header, and the Project-level SAC are reset (if so configured in their definition - see the info panel), ready for the next cycle of project content updates.

Last updated